In Q2 2020, 64,140 sq m of new space was added to the total modern industrial stock in Budapest and its surroundings, as the newest phase of East Gate Business Park (17,780 sq m), the new building of CTPark South (22,840 sq m), the Prologis Harbor DC11 building (13,520 sq m) and the newest phase of Budapest Dock Szabadkikötő (10,000 sq m) were handed over.

The total modern industrial stock in Budapest and its surroundings stood at 2,351,110 sq m at the end of Q2 2020.

Total demand amounted to 202,610 sq m in Q2 2020, which is two times higher than the figure registered in the same period last year and 17% higher than the 4-year average Q2 volume. New leases accounted for 45.6% of the quarterly volume, followed by renewals with a share of 29.2%. Pre-lease stood for 19.6% and expansions for 5.6% of the quarterly figure. Take up excluding renewals added up to 143,350 sq m.

22 leasing transactions were recorded in the second quarter of 2020, out of which 8 agreements were signed for more than 10,000 sq m. The average transaction size was 9,210 sq m during the quarter. 95% of the transaction volumes was recorded in logistics parks, with an average transaction size of 11,890 sq m. The remaining 5% of the transactional volume was registered in city logistics parks, reaching an average transaction size of 2,060 sq m. 14% of city logistics take-up compiled of renewals, while 86% stood for expansions.

The two largest transactions in Q2 were a renewal in Batta Park on 28,585 sq m and a pre-lease in CTPark Budapest South on 28,460 sq m.

The vacancy rate at the end of Q2 2020 stood at 2.59% resulting in a 0.22%-point decline q-o-q, and a 0.45%-point incline y-o-y. At the end of the second quarter a total of 60,930 sq m logistics area stood vacant, and there is only one existing warehouse with available space of more than 5,000 sq m.

Net absorption amounted to 67,030 sq m in the second quarter of 2020.

 

BRF